Qingyun District realizes "automated" garbage

“Using electric vehicles to pick up rubbish saves a lot of effort.” On February 18, 2014, Master Liu of the Qingyunpu District was riding an electric pick-up garbage truck, which made him feel more relaxed. It is understood that Qingyunpu District has recently equipped 180 electric pick-up garbage trucks to initially realize the “automation” of rubbish.

As the Qingyunpu District moves from the suburbs to the downtown area, the area of ​​cleaning roads and cleaning areas has increased year by year. To effectively improve the level of environmental sanitation management and mechanization, Qingyunpu Urban Management Bureau has raised nearly 1 million yuan and purchased 180 electric tricycles. Main and secondary roads, back streets and open areas cleaning.

On February 11th, the first batch of electric pick-up garbage trucks were in place, and sanitation workers went through professional training to clean up. With the use of pickup trucks, the new type of cleaners allow cleaners to pick up rubbish without getting out of the car, greatly increasing the speed of picking up cleaning, and at the same time reducing the labor intensity of cleaners. It is reported that the body of the electric tricycle purchased this time has a garbage sorting bin at the rear, and the bins for collecting non-recyclable rubbish can be dismantled and dumped at any time.

Suspension Parts

This classification mainly includes the aluminum alloy die casting Suspension Parts using in Auto area,the raw material is aluminum alloy.
In the die casting process,higher specific pressure is required, so that higher filling speed can be obtained.which is beneficial for alloy to overcome mold filling resistance.and effectively fill each part of the cavity.The Casting General Tolerance is Grade GB-CT4.
Process Technology: High pressure die casting,Cold Chamber
Product Dimensions: Customized
Casting General Tolerance: Grade GB-CT4
Flow Processes: Die casting, Degating to remove the residual of the gate, Polishing and Deburring to remove the burrs, Polishing to remove the parting line, flash,CNC Turning, Cleaning, Packaging, Storaging, Shipping
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper, Plug Gage, Screw Gauge
Application: Machinery Parts
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo

Die Casting Suspension Parts,Aluminum Suspension Parts,Automobile Suspension Parts

NINGBO ZHENHAI BOLANG METAL PRODUCTS FACTORY , https://www.casting-part.com