Jining River water quality before the year before the full compliance

“The limited-treatment industrial enterprises that have not yet implemented or whose construction progress is slow must stop immediately; the centralized sewage treatment facilities should be completed and used faster, and the full-load rate should be more than 75%; before the end of September, the completed garbage recycling stations will be put into use. ......" From the headquarters of the Department of Water Pollution Prevention and Control along the South-to-North Water Diversion Project in Jining City and the Comprehensive Air Pollution Quality Improvement Headquarters of Jining City, the "One-hundred-Day Concentration Action Plan for Air Pollution Prevention and Control of the South-to-North Water Transfer Project of the City" was published. This reporter learned that Some specific measures proposed in the "Program".

The company hasn't yet implemented a limited treatment before the end of October. The industrial enterprises have been shut down and stopped before the end of October to strengthen the supervision of industrial enterprises that have completed their tasks to ensure stable operation. The industrial enterprises that have not yet accepted the inspection have been hurried to apply for acceptance... "This work is now under the responsibility of the Municipal Environmental Protection Bureau. Supervision has been implemented, and all departments have specific departments responsible for supervision and supervision.” The staff member told reporters that the next step is to govern enterprises that have not yet implemented or have slow construction progress, and related counties, cities and districts. The production and production restriction or closure of the relocation plan shall be made in advance and put into effect by the end of October. “Sewage treatment plants that have completed Class A A transformation shall ensure stable operation and achieve comprehensive compliance with all indexes including total phosphorus total nitrogen.” In response to the plan to accelerate the construction of urban sewage treatment plants and supporting pipe networks, He explained that in the next step, the Municipal Housing and Construction Commission and other departments will complete and put into operation the sewage treatment project included in the “Promotion Plan for Water Pollution Prevention and Control of the South-to-North Water Diversion Project of Jining City” according to the time node, and the unfinished construction will be completed at an accelerated pace to enable it to operate at full capacity. The rate reached more than 75%. “The ultimate requirement is to make the amount of recycled water resources meet the planning requirements so that it can be reused as designed before the end of the year.” He said that the most important thing is to improve the construction of supporting pipe networks to block the direct discharge of domestic sewage in urban areas and eliminate Domestic sewage is discharged into the river without treatment.

Before the end of September, the completed Jininggang Guozhuang operation area, Liuzhuang operation area, Fucun operation area, and Sundame-Hong Kong's 4 garbage collection and transfer stations and sewage (oil) water treatment stations will all be put into use and put into full play. Environmental benefits.

Promote the reduction of pesticides and chemical fertilizers, reduce the amount of pollutants entering the river and increase the overall utilization of crop straw in agricultural production; carry out pollution control of livestock and poultry breeding, complete the elimination of river livestock and poultry breeding before the end of September, and strengthen river channel supervision to prevent There was a rebound after cleanup.

To ensure the use of 30,000 tons of water for daily use, “The Municipal Environmental Protection Bureau, the Municipal South-to-North Water Diversion Bureau, and the county and municipal governments and administrative committees shall accelerate the application acceptance of completed artificial wetland projects; and accelerate the construction of constructed wetlands for the constructed wetland projects. The progress of the construction will be put into use and improve the self-purification capability of the water body so as to exert its effectiveness in pollution control.” The reporter saw in the “Programme”: Before the end of September, the city’s seven water interception projects should all be put into operation. “We are currently in the middle of the project. The preparatory work for the water interception and storage project will be done.” He told reporters that the construction of the 80,000-ton water reuse pipe network and power plant in Jining Sewage Treatment Plant should be completed by the end of September in Jining City. From the sewage treatment plant to Huaneng Jiaxiang Power Plant's reclaimed water network and Huaneng Jiaxiang Power Plant's reclaimed water reuse facilities to ensure daily use of 30,000 tons of reclaimed water. At the same time, the Huaneng Jining Power Plant's commissioning and operation of reclaimed water facilities should also ensure that 30,000 tons of reclaimed water is used daily. The Municipal Water Conservancy Bureau shall verify the water use plans of the three power plants. If the requirements for reuse cannot be fulfilled, the Municipal Water Resources Bureau will reduce the amount of other water supplies according to the approved use of water before the end of September.

Sewage plant and constructed wetland will be completed. By the end of September, both the old canal constructed wetland and the Xinfu River constructed wetland should be operated at full load in accordance with the design requirements and installed on-line monitoring equipment for inflow and outflow. He told reporters that before the end of September, it is necessary to ensure The sewage interception project in Jining City operates according to design requirements. A joint dispatch will be conducted for the water volume of the Xinfu River Constructed Wetland, the Old Canal Constructed Wetland and the Jining City Interdiction and Diversion Works to meet the requirements for the water quantity of each project during different periods. “The management committee of the High-tech Zone of Jining City shall complete the effluent from the wastewater treatment plant of the High-tech Zone and the Second Sewage Treatment Plant of the High-tech Zone and the construction of the Yanfu River Constructed Wetland and the Diversion and Diversion Works of the Jining City, and solve the problem that the outbound water quality in the High-tech Zone cannot reach the planning. Water Quality Objectives Requirements.” He said that before the end of October, the Municipal Housing and Urban Construction Commission and other departments would block the urban direct discharge of the rivers in the Shufu River Basin and the old Canal City, and prevent domestic sewage from being discharged into the river without treatment.

Googol Diesel Generator, which use the world's latest technology, every product represents the latest cutting-edge technology in the field of diesel engine, fuel consumption ratio, power, weight, and other technical parameters are the most advanced level of the world engine.

Googol Diesel Generator output  power range of the engine is 330-2750KW, bore the range: 128-170mm, cylinder number: 6-20 cylinder.


Googol Generator Diesel  Specification

Google 600KW-1000KW Diesel GeneratorGoogle Diesel Engine Electric Generator

Googol Diesel Generator

Googol Diesel Generator,1250Kva Diesel Generator,625Kva Diesel Generator,800Kw Googol Diesel Generator

Jiangsu Province Suanma Power Equipment Co., Ltd. , http://www.suanma-generator.com