At present, China’s valve industry is still dominated by quantitative expansion, forming excessive competition at the same level in the international market. To change this development approach, we must adhere to the concept of innovation and innovate in product development and technological transformation. Actively cooperate with scientific research institutions and institutions of higher learning to jointly develop new product projects, strive to open up markets at home and abroad, and then overcome quantitative growth, improve product quality, increase the added value of products, focus on independent brand building, to enhance the valve companies in China The status of the global industrial division of labor, improve the ability to resist risks and their own "bargaining" ability, and then enhance the sustainable development of the valve industry competitiveness.
The current lack of professionals has become a bottleneck restricting the further development of China's valve industry, which will inevitably affect the international competitiveness of China's valve industry. To solve this problem, we can take the path of internal development and external introduction. On the one hand, short-term training for existing employees of the company can be strengthened to improve the existing human resources; on the other hand, talents of high-quality industries are introduced through various channels to enhance the intellectual capital of China's valve industry.
Membrane/Water Wall Material and Arrangement:
The
furnace and roof are made up of membrane water wall and hung on the
steel structure by upper hanging suspender of water cooling upper
header. Furnace intersecting surface is 3170×5290mm2 and
the elevation of top furnace is 28877mm. The membrane water wall is
made up of φ60×5 and 6×45 welding steel flat. The combustion chamber is
made of φ60×4 steel tube and welded with pin to fasten refractory
material. The upper part of combustion chamber connects with furnace
membrane water wall. The lower part connects with water cooling wind
chamber and water cooling air distributor. The water cooling wind
chamber is made up of φ60 steel tube and welded with pins to fasten the
refractory material. The water cooling distributor is welded with
φ60 steel tube and 6X45 steel flat. The small holes on the steel flat
connects with the funnel cap.
The
furnace divides left, right, front and back water circulation circuit.
The steam leading tube is made up of φ133×5 and φ108×4.5 steel tube. The
downcomer is made up of φ108×4.5 steel tube. Install the blowdown valve
under the lower header to periodic blow down.
Heat Surface,Scraped Surface,Heat Transfer Surface,Heating Surface For Coal Boilers
Jinan Boiler Group Co., Ltd. , https://www.jinanboilergroup.com