The main console is used for remote control of various electric valves and cooling tower fans, monitoring high-voltage and low-voltage power supply parameters and implementing remote emergency intervention parking for air compressors. The measurement, display and alarm system has a data acquisition and processing system. The temperature parameters are used to measure the thermal parameters of each station of the gas source system and print the records. The main parameters and working conditions are displayed in real time on the process display. Overrun alarm. The energy management system is a computer-centric air compressor remote control system. There is a modem communication cable between the computer and the air compressor. A PC can be used to remotely control up to 8 air compressors. The operation control and the detection of its internal operation and status parameters adjust the alarm and automatic stop setting values ​​of various parameters on the air compressor control cabinet panel and control the operation of each air compressor in the most energy-saving manner.
In each of the above systems, the air compressor and its energy management system and air intake filter, air intake throttle valve, aftercooler, centrifugal gas water separator and water treatment equipment are selected from foreign products; dryer and air filtration The device is jointly developed by the country; the total temperature compensator and gas storage system, circulating cooling water system and central monitoring system, as well as pneumatic back pressure pipe and instrument air source are all developed by the unit. The development work began in 1991, and the system was coordinated in July 1993 and subsequently put into operation. The technical identification data and long-term operation of the system show that: (a) the finished gas output rate is 87% of the suction flow rate; (b) the normal pressure dew point of the finished product gas can reach -38 ° C, and the corresponding moisture content is 0.009%, which is much lower than Design value; (c) dust content of finished product ≤ 1mgm3; (d) When the flow rate is up to 140kgs and the test duration is 40s, the total temperature compensator can ensure that the total temperature of the front chamber of the wind tunnel does not exceed 1.5K, (e During the continuous observation period of 12 months, the maximum variation of the average total temperature of the wind tunnel is 289 ~ 293K, the maximum difference is only 4K; (f) other performance of the system meets the design requirements.
HONGWUHUAN crawler Drilling Rigs are suitable for mining, quarrying, railways, transportation, water conservancy, building materials, military and other open-air engineering drilling deep blasting, high efficiency drilling operation. Also widely used in bolt support, trench excavation, sewer engineering drilling operations. HC725.HC726.HC728.HC420.HC430.H680 series crawler DTH drilling rigs are new drilling rigs, developed to meet the market demand, excellent performance, flexible operation, full features, more wider adaptability, high cost performance. In order to adapt to different working conditions and customers` requirements, various specifications of diesel engines and motors are used to meet various requirements.
Crawler Drilling Rig,Crawler Water Well Drilling Rig,Hydraulic Crawler Drilling Rig,Crawler Anchor Drilling Rig
Quzhou Able Machinery Equipment CO., LTD. , https://www.able-machine.com