Daily maintenance work of high-pressure cleaners:
1. Maintenance of the transmission system:
1If there is looseness in each connector and solid part.
2Is there any leakage or seepage in the seals and joints?
3 whether the operation of each component is light, flexible, stable and normal, and whether there is abnormal noise such as impact or vibration.
4 whether the temperature rise exceeds 40 °C.
2. Water system maintenance:
1 Before the operation, check whether there is water leakage and water seepage at the seals and joints. Otherwise replace the seal. 2 The inspection is started once a week, and once a month, if the filter contains dirt or other dirt.
3. Maintenance of hydraulic system:
1 Before the operation, inspect whether the seals and joints have oil leakage or oil leakage. Otherwise, replace the seals. 2 Check the filter dirt in the tank every six months.
4. Add oil, grease, add and replace according to the table below.
5. Maintenance: After stopping the use each year in the fall, conduct an inspection and main components are greased and sealed.
I believe that through the above introduction, we can have a better understanding of the high-pressure cleaning vehicle. As long as we care more, we can also extend the service life of our sanitation e-mail high-pressure cleaner.
99.9% Nitrogen Generator,99.9% 10Nm3/H Nitrogen Generator,Industrial 99.9% 10Nm3/H Nitrogen Generator,Nitrogen Onsite Generator
Jiangsu Minnuo Group Co.,Ltd , https://www.mngroupcn.com