Water heating installation details one: pre-installation
Prior to the formal paving of the ground facilities, the design drawings should be confirmed and the site should be cleaned up. Then install the temperature control line and sub-collector, these processes are also very important, which involves the slot, assembly and so on. These issues are related to the normal use of warmth in the future and must be properly and standardly installed.
Water heating installation details II: Preparation
Warm-up installation preparation: clean up the construction site after entering the site, and determine the installation positions of the main engine (wall-hung boiler) and the sub-water collector, so as to prepare for the subsequent construction.
Water heating installation details three: full installation
After the temperature control line is buried and the sub-water collector is installed at the designated position, the ground insulation and heating pipes can be laid. Although these parts do not seem difficult, in fact, some of the small details are important. For example, after the surface pipes are laid, acceptance tests should also be carried out to ensure normal use.
Water heating installation details 4: laying insulation
First, cut the insulation board according to the actual size, and then lay it. When laying, leave a gap for the pipeline.
First spread the insulation board, and then lay the reflection film. The insulation board shall be tightly adhered when laying, and the edges of the two reflective films shall also be adhered with tape.
Then lay the wire mesh on the top, the edges of the two fast steel meshes should be connected with a special tie, and finally the pipe can be installed.
Water heating installation details 5: laying pipes
To prevent heat loss, must be for the sub - catchment length of tubing to put special installation room insulation sleeve; the jacket pipe insulation sleeve connected to the sub - at the sump and connected to a conduit in its The temperature control valve; when paving the pipeline, the corners of the pipeline must be carefully tied with a tie, and then use a special plastic card to fix it to prevent loosening; after the pipe is laid, put the pipe on the cover again The return-splitter is fixed so that the warm pipes are all laid.
Water heating installation details 6: pressure test
Inject cold water into the paved pipeline. After the pipeline is filled with water, use a special pressure machine to drive 10 kg of pressure. After 24 hours of sealing, if the pressure of the pipeline is not less than 6kg at this time, it means that the pipeline has no leakage and can be used normally.
Shanghai Shure Environmental Technology Co., Ltd. Tel
Pure metal powder for thermal spray refers to a fine powder made from a single metal, such as aluminum, nickel, or titanium, that is used in thermal spray processes. Thermal spray is a coating technique where the metal powder is heated and propelled onto a substrate to create a protective or decorative coating. The pure metal powder is typically chosen based on the desired properties of the coating, such as corrosion resistance, wear resistance, or thermal conductivity. It is important to use pure metal powder to ensure the coating has the desired composition and performance characteristics.
Tungsten Powder,Plasma Spray Powder,Pure Tungsten Powder,Tungsten Metal Powder