According to reports, the installation pressure test of the medium-pressure steam pipe network for the main unit of the 800,000-ton methanol project has been completed, which has created the conditions for the main unit pipeline purging. For public works, the desalinated water unit produced qualified water on June 4th, and the water purification plant also produced qualified water on June 30, laying the foundation for the overall test run of the project. At present, the installation of main equipment, pipelines, and electric instruments is still under intense pressure.
The person in charge of the relevant department of China National Chemical Industry Co., Ltd. said that since the beginning of summer this year, the high temperature weather that has lasted for many days has exerted great pressure on the construction. At present, there are more than 1,400 construction workers on the project site, to overcome the problems of high temperature, domestic design changes, and self-provisioning. The project was put into operation on schedule. On the one hand, the company adjusted the time for construction work. On the other hand, it performed logistics service work. The administrative staff sent mung bean soup and herbal tea to workers every day to prevent workers from suffering heat stroke.
The 800,000-ton methanol project is located in the Oriental Industrial Park. The project adopts the world's most advanced methanol manufacturing process, featuring low energy consumption, short process flow, low equipment, small footprint, and high economic value added. Project design capacity Nissan produces 2,500 tons of methanol, and the total energy consumption per ton of methanol is far lower than that of domestic medium-sized methanol plants.
Polyurethane Thermoplastic Series Products
Polyurethane Thermoplastic Series Products,Polyurethane Thermoplastic,Polyurethane Thermoplastic Series,Thermoplastic Series Products
Shaanxi Yanchang Petroleum Northwest Rubber Flexible Pipe Co., Ltd. , https://www.cnrtp.com