Leshan Vocational and Technical College New Campus Construction Project

Project Name: New Campus Construction Project of Leshan Vocational and Technical College (2011-2012, 400 million)
Progress phase: preliminary design and construction period: 2011-2012 Major equipment: cranes, fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities, air-conditioning, elevators, teaching equipment, building materials.
Project Profile: The project is located in Suji Town, Shizhong District, Leshan City, Sichuan Province, with a total construction area of ​​approximately 240,000 square meters.
The total investment of the project is 400 million yuan. Construction unit: Leshan Vocational Technical School Postal address: 108 Xiaoba Road, Shizhong District, Leshan City, Sichuan Province Post Code: 614008
Contact person: Mr. Zhang Telephone Design Unit: Chengdu Meisha Architectural Design Co., Ltd. Postal address: No. 16 Xinghui West Road, Chengdu, Sichuan Province Post code: 610081
Contact: Yang Shifu Telephone: 028-83222228
Fax: 02883230119

Related Developments: Tower Crane Infrastructure Project

Spray Wires

Thermal spray wires are used in thermal spraying processes, which involve the application of a coating material onto a surface. These wires are specifically designed to be melted and sprayed onto a substrate to create a protective or functional coating.

Thermal spray wires are typically made from materials such as metals, alloys, or ceramics. They are available in various diameters and compositions to suit different applications and requirements. The wire is fed into a thermal spray gun, where it is heated to a molten state and propelled onto the surface being coated.

Spray Wires,Arc Spray Coating,Thermal Arc Spray,Thermal Spray Wire

Luoyang Golden Egret Geotools Co., Ltd , https://www.xtchvaf.com