The SAIC commercial vehicle new energy base was built by Shanghai Shenwo Bus Company, SAIC Commercial Vehicle Technology Center, and Shanghai Huizhong Automobile Manufacturing Company and other related units. It was responsible for providing 120 pure electric, super-capacitors and hybrids for the 2010 Shanghai World Expo. The responsibility of the power bus. Up to now, more than 90 off-line buses have been completed, and 46 vehicles are qualified for delivery. The entire production schedule is under control.
In order to complete the delivery of all 120 buses on March 20th, the base staff started production from the beginning of the first month and worked overtime to ensure progress. During the period, there were bright spots everywhere in the base.
Here are a few picks to showcase the elegance of the base staff.
Zhou Guoyong, who is the material distributor, is responsible for the scheduling of conventional and special materials. Because some materials need to be transferred in the Sunward company, and each batch of materials must correspond one by one, can not go wrong. Due to long hours of overloading work, his physical resistance decreased, he even had a high fever and foamed mouth, but he still insisted on his job. Other comrades advised him to rest for a few days and raise his body. He answered: There is no way to rest. If you change for others, the entry and exit links and time nodes of the materials cannot be controlled. Once you make a mistake, the consequences are serious. Therefore, he stayed on the job.
The electrician Zhao Hui is characterized by being unassuming and doing things as long as there are tasks and without urging them to do so. There was a second-in-a-half high fever and the unit still went to work. He also climbed onto the passenger car roof to install a corner light. Colleagues advised him not to go to the top of the car. He said, "It doesn't matter if you just bite your teeth. It will pass." In this situation, the employees present were impressed.
Employee Shen Hong has been over 50 years old. She has a high fever and insists on working. She works overtime until 8-9 o'clock in the evening and then goes to the hospital to do some drip. As he was responsible for installing the passenger train assembly, he was faced with heavy tasks, so infusions often could not continue so that the condition developed into pneumonia. Some employees also suffered from high fever due to skin scratches and stayed at work for work...
There are also some employees in the base stationed in Beijing, Xi'an, Chongqing, Hangzhou and other suppliers. In order to ensure the timely delivery of parts and components, they are integrated with suppliers to negotiate and solve the supply time nodes and quality assurance. For example, employees in Beijing work in 9 units. Therefore, they work every day until 11-12 in the evening and are praised by local companies.
Why do employees at the base ask me so much work? Their answer is: For a common goal: Dream World Expo, let the new energy bus produced by SAIC Commercial Vehicle Base Mercedes-Benz in the Expo Site!
DHK024 rotary bearing structure Drilling And Milling Machine features:
1. The machine base is made of high quality cast iron, using the lathe bed and slide of the Vertical Machining Center, so it is of high rigidity structure.
2. The guide for quenching grinding and sticking plastic with matching guide rail model, automatic lubrication interval, no crawling on the smooth feeding, good accuracy stable.
3. The machine tool with powerful cutting ability.
Rotary Support Drilling And Milling Machine
Rotary Support Drilling And Milling Machine,Milling Machine With Rotary Worktable,Drilling Milling Cutting Cnc Machine,Rotary Milling Machine
NingXia DaHe Machine Tool (Group) Imp And Exp Co.,Ltd , http://www.nxdhjcmachine.com