Commercial production began in April 2006. Mine underground mining tunnels manner, flotation and reselection method for recovering gold. Rice Like production capacity: processing ore amount of 1,130 tons / day. The initial daily processing of ore is 900 tons, mainly dealing with low grade ore piled on the surface and tunnel. When the ore grade is stable, the planned gold ore recovery rate is 95%. It is estimated that the production of gold in 100,000 ounces in 2008 will reach 75% of the mineral processing capacity. The ore reserves/resources amounted to 2.787 million tons, and the average grade was 8.75 g/ton. San Gold has a 100% stake. (Source: Resource Network)
Cylinder Repair Kits for DAEWOO Booms and Midarms
Available for DAEWOO Travel Motor Repair Kits
Available for DAEWOO Rotary Motor Repair Kits
Suitable for DAEWOO Tensioner Cylinder Repair Kits
Available for DAEWOO Joystick Repair Kits
Available for DAEWOO Distribution Valve Repair Kits
Available for DAEWOO Pilot Pump Repair Kits
Suitable for DAEWOO Hydraulic Pump Repair Kits
For Daewoo Cylinder Seal Kit,For Daewoo Riser Repair Kit,Riser Repair Kit,Rotary Motor Seal Kit
Safe Seal Technology Co., Ltd. , https://www.jolseals.com