Standard | DIN/JIS/ANSI |
Material | SS304, SS316 |
Specification | machinery |
Head shapes | Round head |
Screw thread | Coarse thread  |
Screw tip | Flat point |
Finish  | A2-70/A2-80/A4-70/A4-80 |
Features | Good anti-corrosion ability |
Grade | A2, A4 |
Certification | ISO9001:2008, SGS, RoHS, Bureau Veritas |
OEM service is also available |
Product Detail
Factory Introduction
Our main factory is located in Xinghua city, Jiangsu province and has been in the fastener industry since 2002. We are the branch in Zhongshan City. In order to provide a fast service for domestic customers, we set a warehouse in Zhongshan, so our response time is within 24 hours for domestic customers. For overseas customers, we can delivery the standard fastener within 3 days, and non-standard one in 15 days.Â
Package and Shipment
Our standard package is: neutral inner white box and outer carton, usually 6Â pcs/box according to sizes, outer carton is 27*27*17cm. Pallet is needed if the products are too heavy. For colorful boxes, extra fee will be charged.Â
FAQ
A: Are you a factory or a trader?
We are manufacturer with factory plant located in Xinghua city, Jiangsu province and we are the the branch in Zhongshan city
B: What is your MOQ?
1PC is acceptable,but only for standard products
C: can IÂ have my own design products
Yes, we also offer OEM service and can provide non standard products as well.
D: How is your lead time
For standard products, we mostly have product in stock, so we can make fast delivery. For domestic market(within 24 hours), for oversea market(within 3Â days the fastest). For non-standard products or out of stock products, lead time is usually around 15 days.
E: do you have a website, where can I see your new products?
Yes, our website is www.rankoofastener.com. You can see our new products both from here or through our website
Â
Â
 Stainless Steel 304 Wedge Anchor Bolt
Standard | DIN/JIS/ANSI |
Material | SS304, SS316 |
Specification | machinery |
Head shapes | Round head |
Screw thread | Coarse thread  |
Screw tip | Flat point |
Finish  | A2-70/A2-80/A4-70/A4-80 |
Features | Good anti-corrosion ability |
Grade | A2, A4 |
Certification | ISO9001:2008, SGS, RoHS, Bureau Veritas |
OEM service is also available |
Product Detail
Factory Introduction
Our main factory is located in Xinghua city, Jiangsu province and has been in the fastener industry since 2002. We are the branch in Zhongshan City. In order to provide a fast service for domestic customers, we set a warehouse in Zhongshan, so our response time is within 24 hours for domestic customers. For overseas customers, we can delivery the standard fastener within 3 days, and non-standard one in 15 days.Â
Package and Shipment
Our standard package is: neutral inner white box and outer carton, usually 6Â pcs/box according to sizes, outer carton is 27*27*17cm. Pallet is needed if the products are too heavy. For colorful boxes, extra fee will be charged.Â
FAQ
A: Are you a factory or a trader?
We are manufacturer with factory plant located in Xinghua city, Jiangsu province and we are the the branch in Zhongshan city
B: What is your MOQ?
1PC is acceptable,but only for standard products
C: can IÂ have my own design products
Yes, we also offer OEM service and can provide non standard products as well.
D: How is your lead time
For standard products, we mostly have product in stock, so we can make fast delivery. For domestic market(within 24 hours), for oversea market(within 3Â days the fastest). For non-standard products or out of stock products, lead time is usually around 15 days.
E: do you have a website, where can I see your new products?
Yes, our website is www.rankoofastener.com. You can see our new products both from here or through our website
Â
Â
Â
Polymer Concrete Cells For ER/EW Processing Of Nonferrous
- Vinyl ester resin monolithic casting electrolytic cells
The Internal layer is a monolithic tank made with multiple layers of fiber-reinforced vinyl ester resin (FRP) complying with chemical barrier international norms that assure long-term impermeability and corrosion resistance.
The Intermediate layer is the structural core made with polymer Concrete, with a patented formulation to achieve a low coefficient of thermal expansion, providing long-term structural integrity with low thermally-induced stresses
The External layer is a standard seal layer of FRP that further protects the structural core from electrolyte splashes and spills. Optionally,this external seal may be specified with multi-layered oriented fiber reinforcements to guarantee trouble-free operation in unusually extreme operating environments.
Benefits of electrolytic cells
Long-term impermeability, free of corrosion, 20+ years warranty
Our monolithic internal tank manufactured with multiple layers of fiber-reinforced premium vinyl ester resin. It has continuous service without leakage, free of corrosion and structural flaws which operating under normal conditions as specified for each project.
Swift, accurate and less costly installation
Electrolytic cells include features that allow reduction of 25% or more in time needed for cell erection, alignment and leveling compared to time required with conventional polymer concrete cells. Dimension tolerances for electrolytic cells are consistently tight, simplifying installation in the most demanding applications,including plants with automated crane systems.
Minimum cleaning time and water consumption
The rounded internal shape,optional sloped cell floors,and smooth,flat finish of the internal tank,facilitate water sweeping and drainage of heavy sludge,with reduced water usage and accelerating return to service after each cleaning.
Minimum maintenance cost
The robust, virtually impervious internal tank that is chemically bound to the polymer concrete structural core during molding is tolerant to operating abuse its smooth,non-stick surfaces minimize adhesion of contaminants.
Maximum operational safety
The structural core of electrolytic cells is bolstered with sturdy external seismic reinforcement blocks confining its floor supports, and includes a robust, internal bidirectional, pultruded FRP bar mesh reinforcement which positively maintains integrity should the cell fail due to catastrophic events. Electrolytic cell installation protocols call for lateral wall collaboration between cells,thus reducing stress levels of cell around 40% under normal operating conditions.
Polymer Concrete Electrolytic Cell,Electrolytic Cell Nickle,Electrolytic Cell Nickle Refining Tanks,Electrolytic Cells of Electroplating Equipment
Hebei aoliande Chemical Equipment Co., Ltd , https://www.aoliandechemical.com