Model NO.: J1711255
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: DME
Customized: Customized
Size: According to Customers Requirement
Mould Quality Control: Professional QC in House
Mould Runner System: Hot or Cold Runner System
Mould Standard: Dme, Hasco, Lkm, etc
Mould Design Software: Ug, Proe, Solidworks CAD, Ect
Mould Cooling System: by Experienced Designer
Mould Base: S50c
Heat Treatment: Nitriding
Design Time: 7days
Trademark: JSLMOULD
Transport Package: High Quality Wooden Case
Specification: DME, HASCO, LKM, etc
Origin: Huangyan, Taizhou, China
HS Code: 848071909
Model NO.: J1711255
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: DME
Customized: Customized
Size: According to Customers Requirement
Mould Quality Control: Professional QC in House
Mould Runner System: Hot or Cold Runner System
Mould Standard: Dme, Hasco, Lkm, etc
Mould Design Software: Ug, Proe, Solidworks CAD, Ect
Mould Cooling System: by Experienced Designer
Mould Base: S50c
Heat Treatment: Nitriding
Design Time: 7days
Trademark: JSLMOULD
Transport Package: High Quality Wooden Case
Specification: DME, HASCO, LKM, etc
Origin: Huangyan, Taizhou, China
HS Code: 848071909
JSL Mould Quality ControlFor the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- checking each part of mould's size after machining, according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's requirement again before mould shipping.
Product Name | Motorbike Headlight Visor Plastic Mould Manufacturer |
Product material | ABS |
Core& Cavity Steel | 718 |
Steel hardness: | HRC34-38 |
Mould Standard | DME, HASCO, LKM, etc |
Cavity Number | ONE |
Injection System | Side gate |
Ejector System | Lifter |
mould base |
S50C Â |
Cycle Time |
40S Â |
Tooling lead time | 60DAYS |
Mould life | 1, 000, 000SHOTS |
Quality assurance | ISO9001 |
Specification | According to client' s requirements |
 |
 |
Our Advantage | Â Â Â Â Â 1. High quality |
     2. Reasonable price | |
     3. On time delivery | |
     4. Good After-sale service | |
     5. Strict quality control | |
     6. All the mould are automotic. | |
 |
 |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule | |
In-time mould test and sample delivery | |
In-time mould delivery. | |
injection motorcycle mould  | |
1. Samples/Drawing & Requirement from you | |
2. Mould design: we will Communicate& Exchange the opinion with you after you place order. | |
3. Material Purchase: Steel cutting and Mould base tooling. Â | |
4. Assembling. | |
5. Inspection of mould: following and controlling the tooling processing. | |
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! | |
7. Your instruction & confirmation for shipment. | |
8. Ready made mould before packing. | |
 |
 |
FAQ:  1.How about your quality control? We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise. 2.What's your lead time? For most mold, 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved. 3.How to approval samples? 1) You can come to our factory to see the mold testing directly. 2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email. 4.What about your after service? Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help. For more information please contact us.  |
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- checking each part of mould's size after machining, according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's requirement again before mould shipping.
Product Name | Motorbike Headlight Visor Plastic Mould Manufacturer |
Product material | ABS |
Core& Cavity Steel | 718 |
Steel hardness: | HRC34-38 |
Mould Standard | DME, HASCO, LKM, etc |
Cavity Number | ONE |
Injection System | Side gate |
Ejector System | Lifter |
mould base |
S50C Â |
Cycle Time |
40S Â |
Tooling lead time | 60DAYS |
Mould life | 1, 000, 000SHOTS |
Quality assurance | ISO9001 |
Specification | According to client' s requirements |
 |
 |
Our Advantage | Â Â Â Â Â 1. High quality |
     2. Reasonable price | |
     3. On time delivery | |
     4. Good After-sale service | |
     5. Strict quality control | |
     6. All the mould are automotic. | |
 |
 |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule | |
In-time mould test and sample delivery | |
In-time mould delivery. | |
injection motorcycle mould  | |
1. Samples/Drawing & Requirement from you | |
2. Mould design: we will Communicate& Exchange the opinion with you after you place order. | |
3. Material Purchase: Steel cutting and Mould base tooling. Â | |
4. Assembling. | |
5. Inspection of mould: following and controlling the tooling processing. | |
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! | |
7. Your instruction & confirmation for shipment. | |
8. Ready made mould before packing. | |
 |
 |
FAQ:  1.How about your quality control? We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise. 2.What's your lead time? For most mold, 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved. 3.How to approval samples? 1) You can come to our factory to see the mold testing directly. 2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email. 4.What about your after service? Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help. For more information please contact us.  |
90Gsm Fast Dry Paper,Heat Transfer Paper For Cup,Sublimation Paper Fast Dry Up,Fast Dry Sublimation Heat Transfer Paper
GREEN-LIFE PAPER LTD , https://www.green-lifepaper.com