Â
>Used for cutting aluminum and PVC at 45°, 90 ° degrees.
>Â It adopts pneumatic drive and linear guide feeding.
>The right head adopts imported linear guide pair, with high accuracy and smooth working.
>It has features of high accuracy, efficiency, and safety.
Technical Parameter:
Â
Model | LJZ2-420×3600(06B) |
Input voltage | 380V 50Hz |
Input power | 3 Kw |
Air pressure | 0.4~0.6MPa |
Air consumption | 120L/min |
Spindle speed | 2800r/min |
Cutting length | 360~3600mm |
Cutting width | ≤100mm |
Cutting height | ≤150mm |
Cutting angle | 90° 45° -45° |
Saw feeding speed | 0~3m/min |
Saw blade standard | φ420×4×φ30×Z120 |
Overall dimension | 4300×1200×1300mm |
Why Choose Us
Our Advantage
Package
FAQ
1.Are your company a trading one or a factory?Â
Factory + trade (integration), 35 years' focusing on Upvc,Aluminum Window and Doors Equipment ,insulatingÂ
glass equipment and curtain wall equipment.
2.After an order is placed, when to deliver?
 Generally about 15 days,  If  we have inventory, we can arrange shipment within 5 days.Â
 Please be aware that our production lead times depend on specific items and item quantities.
Â
3.What about the warranty with after - sales services?
 12 months warranty. Besides,we can help you to solve your problem freely;
After the warranty,the professional after-sale service team will provide perfect technical support,and help customers solve problems ,encountered while using our products.Handles guest problems and complaints in a professional and timely.
4.What about the services and product' quality?
 Each machine must be carried out 100% quality examination and test before shipment.
 And all machines meet ISO and CE certification.
5. We don't know the machine operation, what should we do?
 We can send engineer to your place, or we provide video training to show you how to install & operate, let  engineer help you online.
Certifications
Â
The anchor drilling rig is mainly used in hydro power stations, railways and highways, in order to prevent and control various geological disasters, anchoring operations are carried out on landslides and dangerous rock masses.It is mainly used in landslide and dangerous rock anchoring projects in tunnels, railways, highway slopes and other kinds of geology, especially for high slope rock anchoring projects. Drilling operations consume less manpower and material resources, have high construction efficiency and high safety factor. It is also suitable for the construction of deep foundation pit support, reinforcement hole for anti-float anchor and foundation grouting, blast-hole in blasting project, high pressure sprinkling stake and tunnel pipe support hole, etc..
The drilling technology with casing of anchor drilling rig is designed to solve the problem that complex rock layers cannot be holed. The drill bit impacts rock continuously, and the broken rock is blown to the ground by the air pressure discharged from the gap between the casing and the drill pipe. The drill pipe and bit can be lifted after punching the hole, and the casing is placed in the middle of the rock layer, so that the rock layer doesn't collapse.
Anchor Drilling Machine,Roof Bolter,Bolting Machine,Anchor Bolt Drilling Machine
JIANGSU XI TEC ENVIRONMENTAL&DRILLING EQUIPMENT COMPANY CO.LTD , https://www.sjxitecdrilling.com