Analysis of Three Causes of Poor Pumping in Water Pump

Water pump severe vibration

May be uneven rotor, or coupling poor, bearing wear and tear may also be rotating part of the parts loose, rupture; may be due to the pipe stent is not strong and so on. Can be taken to adjust, repair, reinforcement, replacement and other methods to deal with.

Piping leaks or leaks

Nuts may not be tightened during installation. If the leakage is not serious, in the place of leakage or leakage coated with cement or asphalt mixing oil slurry. Temporary repair can be painted wet mud or soft soap. If leakage occurs at the connector, tighten the nut by hand. Leak serious must re-disassembly.

Overheating filler

As a result of the packing is too tight, the cooling water can not enter the packing, or the shaft surface is damaged. Proper relaxation of packing can be taken to clear up the sealing tube blockage and other measures. Filler wear must be replaced by new ones. Soak it in the oil before installation, insert it in turn, and cut it off, which will reduce water leakage. After the last lap packing is installed, the gland should be installed tightly and the tightness should be adjusted during operation.

Pump is not water or not drained

The reason for the end of the valve stuck, filtered part of the blockage, high water absorption or water leaks, may also be due to the wrong direction, impeller runner blockage and so on. After one by one inspection, respectively, to take the end of repair valve, remove the blockage, correct steering, cleaning impeller and other measures to deal with.

Tower Crane Steel Structure, regarded as the main parts of tower crane, refers to the tower crane jib, tower crane counter jib, tower head, tower crane Telescoping Cage, tower crane turning table,tower crane pull rod, tower crane Mast Section, tower crane Fixing Angle, ect. Steel Structure is made of steel, which fits the name.

Tower crane jib is a metal lattice structure of a normally triangular section, whose main mission is to provide the crane with the necessary radius or range. It is also called a jib. Like the mast, it usually has a modular structure to facilitate its transport.

The Anchorage Frame secures the tower crane mast to a structure or framework and provides stability when the tower crane is under load or experiencing wind forces.

Machinery arm also known as the counter jib, this houses the counterweights and pulleys that balance the crane.

The hook is the main load-bearing component that hauls loads. It is attached to a trolley that allows the hook to raise and lower, as well as move towards and away from the mast. 




Steel Structure

Telescoping Cage Jacking Cage,Crane Telescoping Cage,Tower Crane Jacking Cage,Climbing Cage,Tower Crane Yoke